This building was originally constructed for the Ministry of Public Administration & Information however at the onset of the outfitting phase its use was changed to the Office of the Prime Minister.
The structure comprised reinforced concrete pad and strip foundations, retaining walls and a basement for all the mechanical services, car parking and security facilities. The building frame was a combination of reinforced concrete and structural steel and there were four suspended slabs. The ground floor level to 2nd floor level catered for administrative offices with the 3rd floor level occupied by the Prime Minister and key staff.